Energy & charging / Our ambition

Emission-free operations.
An ambition for 2030.

MTR is working on electrifying its own terminal operations. Electric equipment, generation, storage and charging are being developed together.

The roadmap / Our ambition for 2030

A clear ambition.
A practical approach.

The transition starts with what MTR can manage directly: its equipment, energy use and on-site facilities.

The starting point

Understand equipment & consumption

The existing electric Liebherr 280 harbour crane and electric forklifts are the starting point. Their energy requirements and site constraints inform the plan for further equipment electrification.

Technical development

Equipment, generation, storage & charging

Further equipment electrification is being planned alongside solar generation, battery storage, energy management and charging facilities.

Delivery

Implement in phases

Delivery follows the technical design, available grid capacity and required agreements and permits. Milestones are established for each component.

2030

Emission-free terminal operations

Our ambition for 2030 is emission-free operations within our own terminal. The exact scope, schedule and supporting evidence are being developed.

Energy / An integrated development

Generate. Store.
Manage. Electrify.

01Generate

On-site solar generation, aligned with the detailed energy plan.

02Store

Battery storage coordinated with generation, demand and the available grid connection.

03Manage

Energy management that coordinates equipment demand and charging facilities.

04Electrify

Electric terminal equipment and charging facilities for heavy transport.

In development · agreements, permitting and engineering. Capacity, availability and delivery schedules are being developed.

MTR × Greenvision

A charging hub for
heavy transport.

MTR is developing charging facilities for electric trucks at Pier 1 together with Greenvision.

Charging hub in development

The ambition also includes carriers and businesses in the Waalhaven. Access, charging power, operating arrangements and delivery schedules are being developed.

Interested in truck charging
Visualisation of an electric truck charging hub
Visualisation · charging hub in development
The wider port / From Pier 1

Starting locally.
Contributing more widely.

01 / Our own operations

Electrify equipment

Our own terminal operations form the basis of the 2030 ambition.

02 / Heavy transport

Enable charging

The charging hub is being developed for electric trucks, with the ambition to serve the Waalhaven too.

03 / Other terminals

Seek collaboration

Experience and facilities at Pier 1 can provide a starting point for further transition across the port area.

MTR / Let’s connect

A shared energy ambition?
Let’s talk.

Discuss your requirements